Drilling Underway at Woodjam
Vancouver, B.C. - TheNewswire - July 6, 2021 - Consolidated Woodjam Copper Corp. ( Woodjam or the Company ) (TSXV:WCC) (OTC:CWMCF) is pleased to announce that drilling is underway at the Woodjam property at the town of Horsefly, BC, approximately 50 km northeast of the city of Williams Lake. The first hole has been collared in the Southeast Zone and is now coring bedrock. Infill drilling by Gold Fields in 2010 targeted a higher grade central area in the Southeast Zone where apparently northeast trending zones of higher grade material had been identified. It is also apparent that this central area carries significantly higher gold values than much of the deposit. The in-fill drilling brought the drill spacing down from greater than 100 m and resulted in outlining a significantly larger area of high grade. In recent data review it is apparent that the drill spacing remains greater than might be optimum for quantifying grade averages and to test this, hole SE21-89 was placed to reduce the hole to hole spacing to 50 m.
Drilling Underway at Woodjam
Vancouver, B.C. - TheNewswire - July 6, 2021 - Consolidated Woodjam Copper Corp. ( Woodjam or the Company ) (TSXV:WCC) (OTC:CWMCF) is pleased to announce that drilling is underway at the Woodjam property at the town of Horsefly, BC, approximately 50 km northeast of the city of Williams Lake. The first hole has been collared in the Southeast Zone and is now coring bedrock. Infill drilling by Gold Fields in 2010 targeted a higher grade central area in the Southeast Zone where apparently northeast trending zones of higher grade material had been identified. It is also apparent that this central area carries significantly higher gold values than much of the deposit. The in-fill drilling brought the drill spacing down from greater than 100 m and resulted in outlining a significantly larger area of high grade. In recent data review it is apparent that the drill spacing remains greater than might be optimum for quantifying grade averages and to test this, hole SE21-89 was placed to reduce the hole to hole spacing to 50 m.