Governor, lawmakers debate longer run for California nukes
LOS ANGELES (AP) — California Gov. Gavin Newsom and a group of legislators reached a last-minute compromise to extend the lifespan of the state’s last operating nuclear plant by up to five years. But the proposal faces an uncertain future as the Legislature concludes its two-year session this week. To pass, the proposal to keep the Diablo Canyon Nuclear Power Plant running needs a two-thirds vote in the state Assembly and Senate, a threshold that can be difficult to reach. Last week, a competing proposal emerged from Democratic legislators that would use $1.4 billion to speed up development of renewable power and transmission lines, while leaving intact plans to shutter the twin-domed plant by 2025. Newsom has argued that the reactors are needed to fill gaps in the state power supply as California transitions to solar, wind and other renewables. He earlier proposed the reactors remain online for an additional 10 years, which was dropped in the latest version of the plan. The legislation is anchored to the assumption that operator Pacific Gas Electric will qualify for a share of $6 billion the Biden administration has set aside to rescue nuclear plants at risk of closing.
Governor, lawmakers debate longer run for California nukes
LOS ANGELES (AP) — California Gov. Gavin Newsom and a group of legislators reached a last-minute compromise to extend the lifespan of the state’s last operating nuclear plant by up to five years. But the proposal faces an uncertain future as the Legislature concludes its two-year session this week. To pass, the proposal to keep the Diablo Canyon Nuclear Power Plant running needs a two-thirds vote in the state Assembly and Senate, a threshold that can be difficult to reach. Last week, a competing proposal emerged from Democratic legislators that would use $1.4 billion to speed up development of renewable power and transmission lines, while leaving intact plans to shutter the twin-domed plant by 2025. Newsom has argued that the reactors are needed to fill gaps in the state power supply as California transitions to solar, wind and other renewables. He earlier proposed the reactors remain online for an additional 10 years, which was dropped in the latest version of the plan. The legislation is anchored to the assumption that operator Pacific Gas Electric will qualify for a share of $6 billion the Biden administration has set aside to rescue nuclear plants at risk of closing.