Risk Planning and Management for the Panama Canal Expansion Program

Publication: Journal of Construction Engineering and Management
Volume 137, Issue 10

Abstract

In April 2006, the Panama Canal Authority formally proposed a major expansion of the canal to increase its capacity and make it more productive, safe, and efficient. This proposal included cost and schedule estimates for completing the expansion and was supported overwhelmingly by the citizens of Panama in an October 2006 public referendum. Given the conceptual level of design at the time of the proposal and the inherent uncertainty in a project of this magnitude at the early stages of engineering, a comprehensive risk analysis was performed to develop a contingency model for the total expansion program cost and schedule. This contingency model is based on a Monte Carlo simulation of the cost and schedule estimates, taking into account the most significant risks identified for the project. The resulting model provides contingency assessments for duration and total cost and sensitivity analysis of the risks; it also allows for multiple scenario planning and ultimately supports overall risk management. This paper presents a project case study that focuses on the contingency model development and the resulting risk management and contingency resolution processes.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The writers would like to acknowledge the efforts of the many engineers from around the world who put significant time and effort into designing, estimating, and scheduling this historic project, particularly the efforts of the Panamanian engineers of the Panama Canal Authority. The writers would also like to acknowledge the efforts of our colleagues who assisted with the cost and schedule review of the estimate: Stuart D. Anderson, Debbie A. Niemeier, and Clifford J. Schexnayder.

References

Akinci, B., and Fischer, M. (1998). “Factors affecting contractors’ risk and cost overburden.” J. Manage. Eng., 14(1), 67–76.
Anderson, S., Molenaar, K. R., and Schexnayder, C. (2009). “Procedures guide for right-of-way cost estimation and management.” NCHRP Rep. 625, National Cooperative Highway Research Program, Transportation Research Board of the National Academies, Washington, DC, September, 223 pp.
Arditi, D., Tarim, A. G., and Gurdamar, S. (1985). “Cost overruns in public projects.” Proj. Manage. J., 3(4), 218–224.
Autoridad del Canal de Panama (ACP). (2006). “Proposal for the expansion of the Panama Canal—third set of locks project.” ACP. April 24, 2006, 92.
Board on Infrastructure and the Constructed Environment, National Academy of Engineering. (2003). Completing the “big dig”: Managing the final stages of Boston’s central artery/tunnel project, The National Academies Press, Washington, DC.
Booz Allen & Hamilton Inc. & DRI/McGraw-Hill. (1995). The transit capital cost index study. Federal Transit Administration, Washington, DC.
Bruzelius, N., Flyvbjerg, B., and Rothergatter, W. (1998). “Big decisions, big risk: Improving accountability in mega projects.” Int. Rev. Admin. Sci., 64, 423–440.
Callahan, J. T. (1998). “Managing transit construction contract claims.” Transportation Research Board, TCRP Synthesis 28, National Academy Press, Washington, DC.
Caltrans. (2003). Project risk management handbook. California Department of Transportation (Caltrans), Office of Project Management Process Improvement, Sacramento, CA.
Chang, A. S-T. (2002). “Reasons for cost and schedule increases for engineering design projects.” J. Manage. Eng., 18(1), 29–36.
Federal Transit Authority. (2004). “Risk assessment methodologies and procedures.” Project Management Oversight under Contract No. DTFT60-98-D-41013, Federal Transit Administration, Washington, DC.
Flyvbjerg, B., Holm, M. S., and Buhl, S. (2002). “Understanding costs in public works projects: Error or lie?.” J. Am. Plann. Assoc., 68(3), 279–295.
Harbuck, R. H. (2004). “Competitive bidding for highway construction projects.” AACE International Transactions, EST.09, AACE, 1–4.
Highways Agency. (2001). “Highways agency framework for business risk management.” Rep. of the Highways Agency, London 〈http://www.highways.gov.uk/aboutus/10873.htm〉 (Aug. 1, 2005).
Hufschmidt, M. M., and Gerin, J. (1970). “Systematic errors in cost estimates for public investment projects.” The analysis of public output, J. Margolis, ed., Columbia University Press, NY, 267–795.
Mackie, P., and Preston, J. (1998). “Twenty-one sources of error and bias in transportation project appraisal.” Transportation Policy 5, Institute for Transport Studies, University of Leeds, UK, 1–7.
Merrow, E. W. (1988). Understanding the outcomes of mega projects: A quantitative analysis of very large civilian projects, Rand, Santa Monica, CA.
Molenaar, K. R. (2005). “Programmatic cost risk analysis for highway mega-projects.” J. Constr. Eng. Manage., 131(3), 343–353.
Molenaar, K. R., Diekmann, J. E., and Ashley, D. B. (2006). “Guide to risk assessment and allocation for highway construction management.” Rep. No. FHWA-PL-06-032, Federal Highway Administration, U.S. Department of Transportation, American Association of State Highway Transportation Officials, and the National Cooperative Highway Research Program, Washington, DC, 73.
Pickrell, D. H. (1992). “A desire named streetcar: Fantasy and facts in rail transit promotions and evaluation.” J. Am. Plann. Assoc., 58(2), 158–176.
Project Management Institute. (2004a). Project management body of knowledge (PMBOK). 3rd ed., Project Management Institute, Newtown Square, PA.
Project Management Institute. (2004b). Project management body of knowledge (PMBOK): Construction extension. 3rd Ed., Project Management Institute, Newtown Square, PA.
Semple, C., Hartman, F. T., and Jergeas, G. (1994). “Construction claims and disputes: Causes and cost/time overruns.” J. Constr. Eng. Manage., 120(4), 785–795.
Touran, A., and Bolster, P. J. (1994). Risk assessment in fixed guideway transit system construction, Federal Transit Administration, Washington, DC.
U.S. Department of Energy. (2003). “Risk management. Office of Management, Budget and Evaluation.” Initiated by Office of Engineering and Construction Management, Washington, DC.
U.S. General Accounting Office. (1997). “Transportation infrastructure managing the costs of large-dollar highway projects.” GAO/RCED-97-47, U.S. General Accounting Office, Washington, DC.
U.S. General Accounting Office. (2003). “Federal-aid highways: Cost and oversight of major highway and bridge projects—Issues and options.” GAO-03-764T, U.S. General Accounting Office, Washington, DC.
Washington State Department of Transportation. (2010). “Cost risk analysis (CRA) and cost estimating validation process (CVEP).” 〈http://www.wsdot.wa.gov/projects/projectmgmt/riskassessment/〉 (May 27, 2010).
Wideman, R. M. (1992). Project and program risk management: A guide to managing project risks, Project Management Institute, Newton Square, PA.
“Woodrow Wilson bridge project bridge superstructure contract (BR-3): Review of the engineer’s estimate vs. the single bid.” (2002).

Information & Authors

Information

Published In

Journal of Construction Engineering and Management
Volume 137Issue 10October 2011
Pages: 762 - 771

History

Received: Jun 7, 2010
Accepted: Nov 1, 2010
Published online: Nov 3, 2010
Published in print: Oct 1, 2011

Permissions

Request permissions for this article.

Authors

Affiliations

Luis F. Alarcón [email protected]
Prof., Dept. de Ing. y Gestión de la Construcción, Pontificia Universidad Católica de Chile, Casilla 306, Santiago 22, Chile. E-mail: [email protected]
David B. Ashley, Dist.M.ASCE [email protected]
Prof. of Engineering, Univ. of Nevada, Las Vegas, 4505 Maryland Parkway, MC 4022, Las Vegas, NV 89154. E-mail: [email protected]
Angelique Sucre de Hanily [email protected]
Consultant, Ancon, Panama. E-mail: [email protected]
Keith R. Molenaar, M.ASCE [email protected]
Prof., Civ., Envir. and Arch. Engrg., Univ. of Colorado, Boulder, CO 80309-0428 (corresponding author). E-mail: [email protected]
Ricardo Ungo [email protected]
Economist, Panama Canal Authority, Panama. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share