Project Summary

PROJECT SUMMARY

  • Project Name : Awash-Kombolcha-Hara Gebeya Railway Project
  • Owner : Ethiopian Railways Corporation (ERC)
  • Designer : Yapı Merkezi İnşaat buy essays online ve Sanayi A.Ş
  • Contractor : Yapı Merkezi İnşaat ve Sanayi A.Ş.
  • Employer’s Repres. : SYSTRA AB cons. with Multi-D Eng.Cons.PLC
  • O&M Co. : Ethiopian Railways Corporation (ERC)
  • Standarts & Codes : EN (Eur.), UIC (Union Intl. Chemindefer, TSE (Turkish)
  • Total Length : 391 km
  • Design Speed : 120 km/h for passanger, 80 km/h for custom dissertation writing services freight (90 km/h at sections with rough topography)
  • Construction Period : 42 months (32 months for Section between km 0-270

MAJOR ACTIVITIES SUMMARY

  • Earthworks : ~ 58 million m3
  • Tunnels : 14 pieces, total length= 9.684 m
  • Bridges : 56 pieces, total length= 6.294 m
  • Overpasses : 10 pieces, total length= 252 m
  • Culverts : 884 pieces, total length= 34,5 km
  • Trackworks : 426 km (including sidings and depot lines)
  • E&M Systems : catenary, power supply, signalling&telecom, OCC
  • Buildings : 10 Stations, Depot and Workshop Facilities, Substations