The LRT Line 1 South Extension Project aims to provide rapid and reliable access to and from the densely populated residential sub-urban communities south of Manila, and the various strategic commercial, industrial, and educational districts in Metro Manila. Savings in travel time and costs will make the mobility of people and goods in the area significantly faster and less costly. The project aims to increase average weekday ridership from 560,000 to 820,000 passengers in 2015.
Department of Transportation and Communications (DOTC)
The current LRT Line 1 will be extended starting from its existing Baclaran Station to the future Niyog Station in Bacoor, Cavite which is approximately 11.7 kilometers. Of this length, 10.5 kilometers will be elevated and 1.2 kilometers will be at-grade. The whole stretch of the integrated LRT 1 will have a total length of approximately 32.4 kilometers and will be operated and maintained by the private proponent.
The private partner will undertake the design, construction, and financing of the Cavite Extension as well as the operation and maintenance of the integrated system upon completion of the project. The concessionaire will also undertake future system maintenance and upgrades as well as permitted commercial development.
PHP 44.65 Billion | USD 0.99222 Billion
Build-Transfer-and-Operate (BTO)
32 years inclusive of construction period
Light Rail Manila Consortium (LRMC)
Ongoing pre-construction activities. Ongoing preparation for procurement of Independent Consultant (IC)
FIRST BIDDING
Prospective Bidders
1. DMCI Holdings (DMCI-Marubeni)
2. Lightrail Manila Consortium (Ayala-MPIC)
3. MTD-Samsung Consortium
4. SMC Infrastructure Resources Inc
Prequalified Bidder/s
1. DMCI Holdings (DMCI-Marubeni)
2. Lightrail Manila Consortium (Ayala-MPIC)
3. MTD-Samsung Consortium
4. SMC Infrastructure Resources Inc
Bidders
1. Lightrail Manila Consortium (Ayala-MPIC)*
*Failed Bidding as Lightrail Manila Consortium submitted a conditional bid
SECOND BIDDING
Prospective Bidders
1. DMCI Holdings (DMCI-Marubeni)
2. Lightrail Manila Consortium (Ayala-MPIC)
3. MTD-Samsung Consortium
4. SMC Infrastructure Resources Inc.
5. Megawide
6. Globalvia (Spain)
7. Ecorail (France)
Bidders
1. Lightrail Manila Consortium (Ayala-MPIC)
Winning Bidder
1. Lightrail Manila Consortium (Ayala-MPIC)
ATTY. RENE K. LIMCAOCO
Undersecretary, DOTC
(+632) 725-0204 loc. 247
MS. ROSALIA E. HAPAL
Project Monitoring Officer, PPP Center
(+632) 709-4146 local no. 5203
Comments are closed.
12 Mar 2015
12 Mar 2015
12 Mar 2015