Full Bleed Image Full Bleed Image

Single Project Single Project

Last updated

projectFP090

Tonga Renewable Energy Project under the Pacific Islands Renewable Energy Investment Program

340395
TONNES of CO2 Anticipated tonnes of CO2 equivalent avoided

Impact

Mitigation
GCF results area
  • Energy generation and access

Location & People

Region
  • Asia-Pacific
Country
  • Tonga TON
Beneficiaries (approx.) 96,000

Investment Data

  • Financing:
    • Public
    • Public / Private
    • Private
  • Project size:
    • Micro
    • Small
    • Medium
    • Large
  • E&S; Risk category:
    • Category A
    • Category B
    • Category C
Total project investment
GCF Financing
  • Instrument Grant USD
Co-Financing
  • Tonga Power Limited Grant USD
  • Government of Australia Grant USD
  • Asian Development Bank Grant USD
  • Government of Tonga   USD

Project owners

Accredited Entity Executing Entity
  • Ministry of Finance and National Planning (MFNP) Tonga
  • Ministry of Meteorology, Energy, Information, Disaster Management, Climate Change and Communications (MEIDECC) Tonga
Tonga Renewable Energy Project under the Pacific Islands Renewable Energy Investment Program Approved October 2018 Est. implementation period 3.417 years
Shifting electricity production in Tonga to a low-carbon, climate resilient path.

Tonga is the second most climate vulnerable country in the world. Like many other Small Island Developing States in the Pacific, Tonga’s energy source is almost exclusively imported diesel. It accounts for 90 percent of its electricity generation. The Government of Tonga has formulated targets to transform its energy sector by achieving a 50 percent share of renewables in the country’s energy generation mix by 2020 and 70 percent by 2030. However, achieving these targets require catalytic investments to transform the country’s energy infrastructure.

This project aims to help Tonga move away from fossil fuels and shift to renewables. The project will deliver utility-scale storage systems to provide base load response and grid stability, paving the way for more renewable energy integration in the main island, while green mini-grids will be installed in the outer islands. While stabilising the grid, this project will particularly address the intermittency of variable renewable energy sources, thus laying the foundation for private sector investments in renewable energy in Tonga. 

The project has an estimated lifespan of 25 years.
Type
Document title
Published date
ESS report FP090 - ADB - Tonga 27 Sep 2018
Approved funding proposal FP090 - ADB - Tonga 22 Dec 2018
Gender action plan FP090 - ADB - Tonga 10 Jan 2019
Gender assessment FP090 - ADB - Tonga 10 Jan 2019
Accredited Entity
  • Asian Development Bank (ADB) Mr. Christian Ellermann Tel: +63-2-632-4564
^ Back to top