Station | |||
Name | CHERNOBYL |
Owner, Operator | |
Owner | Energoatom |
Operator | MINENERGO SSSR - THE USSR MINISTRY OF POWER AND ELECTRIFICATION |
Reactor Characteristics | Dates | ||
Type | LWGR | Construction Started | 1981/01/01 |
Status | Cancelled Constr. | Connected to Electricity Grid | N/A |
Net Capacity | 950 MWe | Commercial Operation | N/A |
Gross Capacity | 1000 MWe | Long Term Shutdown | N/A |
Shutdown | 1988/01/01 | ||
Above data from PRIS database.
Return to Nuclear Power Reactors -
This page was automatically created on 04 Jun 2011, 12:45:28 |